Between yesterday and today the electric has been completed in that all plugs are now connected and have socket covers. The Heating/AC unit is hooked up outside (there is a vent piece that goes on the inside wall), not sure how it works but mom will be able to have her room(s) at the temperature she wants separately from the rest of the house.
The shower door is installed, as well as the vanity and the fan/light has also been installed. Thursday I think the granite for the kitchenette is going in, plumber is coming for toilet and sink hook ups and not sure what else but getting closer to the end!! The last thing will be the laminate flooring that hubby is going to install. Hopefully less than a week to go? The original dates that Steve and I had bet on have already passed. I had bet on April 21st and he bet even earlier than that.